VIU1: Revision RCx
In this chapter, you can find out about the latest hardware revisions.
Your RC variant
Information about your RC variant can be found on the delivery note or your serial number. KXXX-2XXXX | RC2
RC1 - Release Candidate 1
Feature-Expansion
LCD-Display Holder
Cover-Glasses
Introduction of various Docker classes A: IO-Link / B: External Light
Feature-Updates
Powermanagement (1A Output Current for external Lighting)
Modified plane structure, optimization of EMC and ESD safety
Optimizations
Bug fixes in the prototype series
Circuit optimizations
Cables become purchased cables
Construction / case design:
Optimization of housing front and sealing
Circuit design / PCB:
Adaptation of Helios1-X to power management
Power Control Manager on Helios1-X for configuring LED voltage
Adaptation of connector design. Better fastening possible in the inlay
Adjustments to layout. Optimization of camera connection.
Release: July 2020
RC2 - Release Candidate 2
Feature-Updates
Complete IO-Link integration (without FW)
Complete 5G integration (without FW)
Optimization
Construction / Housing design:
Adaptation and optimization for case and docker
Optimization of docker connection via two screws on case wall
Adaptation of thermal connection CPU / WLP / case bottom
Adaptation of interfaces Optimization for keyboard
Optimization of keyboard. Reduction of design radius to 2 mm
Adaptation and further development of cover glass
Protection of cover glass by recessing
Circuit design / PCB:
Renaming Helios to Loxi
Adjustment of debugging area Loxi for EOL tester
Layout optimization for Construct, Docker, and Loxi
Optimization of keyboard and connection during setup
Electronic and EMC optimizations
Assembly optimizations – PCB
Assembly optimizations – Assembly
Release: May 2021